TTC Engineering & Air Conditioning logo
Maxpump logo

Commercial · Sultan's Complex, Amman

MAXPUMP Gym

Full HVAC and ventilation for a 1,000 m² gym: AC units, fresh air, and exposed black spiral ductwork with supply and return distribution.

  • Air conditioning
  • Ventilation
  • Exposed spiral ductwork
  • 1,000 m²
The MAXPUMP Gym building at night, with the outdoor AC units on the roof.

We handled all the HVAC and ventilation for MAXPUMP Gym, a 1,000 m² training floor in Amman: the air conditioning units, the ventilation system, and the ductwork that carries supply and return air across the whole space.

A gym this busy needs more than cooling. Lots of people training hard means the air has to keep moving and the temperature has to stay even, from the weights area to the cardio rows. The ceiling is exposed concrete, so the ducts are on show: black spiral duct with round diffusers dropped over the machines, run in straight lines that sit with the lighting.

What we did

  • Air conditioning systems
  • Ventilation system
  • Ductwork installation
  • Supply and return air distribution
  • Installation of AC and ventilation units

Project photos

The MAXPUMP Gym building at night, with the outdoor AC units on the roof.
The MAXPUMP Gym building at night, with the outdoor AC units on the roof.
Black spiral ducts run across the exposed concrete ceiling above the training floor.
Black spiral ducts run across the exposed concrete ceiling above the training floor.
Round ceiling diffusers drop from the ductwork to supply air over the machines.
Round ceiling diffusers drop from the ductwork to supply air over the machines.

More projects

All projects →

Ready to start your project?

Send us your site details on WhatsApp and get a free quote.